Press "Enter" to skip to content

VDOT holds design public hearing for proposed roundabout

Around 40 people attended a design public hearing held by the Virginia Department of Transportation last Wednesday on the proposed construction of a roundabout at the intersection of Twiggs Ferry and Buckley Hall roads in Cobbs Creek.

Held at the Mathews Family YMCA, the meeting gave Mathews residents a chance to review plans for the roundabout, ask questions, and offer opinions.

Mark Kutz of Powhatan, who visits Gwynn’s Island frequently, said he approves of a roundabout at the intersection because it can be “a little scary when making a left-hand turn with all the traffic coming.” He said a roundabout was recently completed in Chesterfield near his home “and now the traffic keeps moving in a nice steady flow.”

Roxanne Yarina of Dutton said she was torn about the proposal because “people don’t know how to use roundabouts,” while her husband Frank said, “I’m liking it, mainly because people don’t know how to use stop signs.”

Faeq Fasihi, project manager with VDOT consultant Jacobs Engineering, said that most of the people who attended the meeting had been in favor of the proposed change, including a number of people who own property in the vicinity of the intersection.

However, Randy and Debbie Krahn, who live down a nearby road, said that they already have problems with water flowing from Route 198 through their property, and that a roundabout at that location would exacerbate the problem.

Designed to improve safety and traffic operations at the busy intersection, the roundabout would consist of a single lane circling a center island that larger vehicles such as tractor-trailers and farm equipment would be able to track over as needed. Vehicles already in the roundabout would have the right-of-way, causing approaching traffic to slow down in order to enter the traffic pattern.

The cost of the project is expected to be around $8 million, including $1 million in preliminary engineering, $2 million for right of way, and $4.8 million for construction.

Public comment on the proposed project will be accepted through Saturday, with construction slated to begin in early 2029. It is expected to be completed by early 2030.

Comments may be made by emailing fred.comments@vdot.virginia.gov, with the subject line Route 3 and Route 198, by writing to Mr. Celso Santos, VDOT Project Manager, Virginia Department of Transportation, 87 Deacon Road, Fredericksburg, Va. 22405, or by completing the online survey form at publicinput.com/route3androute198.

mathes vdot roundabout meeting 1
SHERRY HAMILTON / GAZETTE-JOURNAL VDOT Fredericksburg District Traffic Engineer Robert Weber and Jacobs Engineering Roadway Engineer Craig Gray, from left, talk with Frank and Roxanne Yarina of Dutton about the proposed roundabout at the intersection of Twiggs Ferry and Buckley Hall roads during a design public hearing held at the Mathews Family YMCA last Wednesday.